Since 2013, PDP has been involved in the options assessment, consenting process and design of a new land disposal system for Hanmer Springs treated wastewater.

Now, with the system under construction and set to be operational in late 2020, Oliver Hunt, a design engineer on the project, spent a day developing new monitoring bores which will form part of the extensive groundwater monitoring regime at the irrigation site.